Description
Construction of four buildings partly in reinforced concrete, partly in steel, partly with prefabricated elements, fire-fighting tanks, prefabricated roofing in laminated wood and steel.
Period: 1999-2000
Characteristics of the intervention:
Warehuose Building: 1 floor
Training Center Building: 5 floors
Office Bulding: 5 floors
Multi Purpose House Buildings: 2 floors
Covered area: 14.900 sqm
Volume: 127.400 cum
Amount of works:
3.615.000 Euro