
ISAV S.p.A. – gruppo ospedaliero Humanitas

Design and Construction supervision of Structures

Saint Pierre – Aosta
Description
The project involved the construction of a Rehabilitation centre consisting in: a building with 40 rooms of two/ three beds on the first and second floors, clinics and offices on the ground floor, services in the basement, covered parking, located in the municipality of Saint Pierre, in a place called “Breyan”.

Period: 2007 – 2008
Characteristics of the intervention:
Gross floor area: 6.239 sqm
Covered area: 1.740 sqm
Volume: 143.200 cum
Maximum height: 12,20 m + 4,30 m Basement