Design and Construction Supervision:
civil, structure and systems engineering
Calcinate – Bergamo
Description
The collaboration between CED INGEGNERIA and Mediberg has developed over time with a series of interventions to renew the plant without interfering on the production.
The interventions were: extension of the clean rooms, partial revamping of the plant with expansion and new flaps, construction of a mezzanine, construction of a temporary changing room and extension of the offices, also divided into phases.
Period: 2015 – 2018
Characteristics of the intervention:
Project area: 13.000 sqm
Covered area: 6.157 sqm
Gross floor area: 10.394 sqm
Volume: 62.500 cum
Amount of works:
1.214.399,00 Euro