Michelin Warehouses – Vercelli and Padova
Description: Construction of warehouses with prefabricated structure, loading ramps on site, bases for tanks, soil treatment with gravel columns.

Serete Italia S.p.a.

Structure design
Structure supervision

Vercelli-Tribano (PD)
Praxair Surface Technologies Plant

Serete Italia S.p.a.

Structure design
Structure supervision

Novara
Strengthening Nitrogen plant/ ILVA Plant

TRE PI

Structure design
Structure supervision

Taranto
Upjhon Plant

Upjhon

Structure design
Structure supervision

Caponago – Milano
Vianini Plant

Vianini & Co s.r.l.

Structure design
Structure supervision

Brugherio – Milano
BASF Plant
Desciption: Construction of a new supplement tower with metal structure and scaffolding support of the plant, external arrangements and reorganization of sewer networks.
Characteristics of the intervention:
Number of floors: 4
Covered area: 270 sqm
Volume: 4.400 cum

BASF

General design and Construction supervision
Technical works specification
Registration
Structure design

Comun Nuovo – Bergamo
Negroni Plant, Cremona
Description:Renovation, recovery and expansion of the NEGRONI sausage factory, with the construction of new intermediate decks to connect the existing buildings, renovation of existing buildings for the mortadella line and cold rooms.
Construction of new steel roofs to connect the various buildings.
Restructuring of the mortadella and cooked line, production, storage and shipping departments.
Recovery of existing buildings with the insertion of new volumes between them, steel roofs with large light, reinforcement of existing structures and recovery of facades.
Characteristics of the intervention:
Number of floors: 5
Covered area: 30.000 sqm
Volume: 280.000 cum

Kraft General Foods S.p.a.

General design and construction supervision
Structure design
Systems engineering

Cremona
ARBED-IRITECNICA furnace construction, R Group

Ferretti Engineering s.r.l.

Structure design

Lussemburgo
Lediberg Plant and offices

Lediberg s.p.a.

Structure design
Structure supervision

San Paolo d’Argon – Bergamo
Cologno Monzese Cogeneration Plant
Description: Construction of a cogeneration plant, with concrete bases for turbines, boiler and tanks, acoustic panels, compressor building, electrical building and electrical substation, arrangement of the area with internal roads, parking lots, drainage and sewer network.
Characteristics of the intervention:
Area: 9,223.25 square meters entirely dedicated to buildings and plants for the production and management of electricity.

Sondel S.p.A.

Project for tender
Construction supervision
Structure supervision