New production line for plastics plant

View more
Client
Assignment
General Design and Construction Supervision
Design and Construction Supervision of Structures
Design and Construction Supervision of Systems
Safety
Place

Filago – Bergamo

Description

The project involves the construction of a new production line of a typical “compounding” plant, in which different thermoplastic resins are produced: PC (polycarbonate), PC/ABS blend and PC/PBT blend.
The raw materials or semi-finished products, coming from different company storage systems, are transported to the line, where they undergo blending, extrusion, granulation, dedusting processes until the final product is obtained. The new production line is developed on a new 2-storey metal structure scaffold, built inside an existing building. On the second floor there are the loading stations of the raw materials, which receive the different materials through pneumatic systems or loads through FIBC. The components are discharged through hoppers, stainless steel pipes and screw conveyors, then dosed in extruder using precision scales. After the mixing, extrusion and granulation phases, the process continues with the drying and dedusting of the product to separate the granule from any residual powder. In addition to the design of structural and civil works in general, CED Ingegneria has prepared the project of electrical and hydraulic-mechanical systems at the service of the new line, including the interface with the systems.
Development of the Industrial project new production line for plastics plant by CED Ingegneria-11

Period: 2016 – 2018

Characteristics of the intervention:
Project area: 2.890 sqm
Covered area: 2.890 sqm
Gross floor area: 3600 sqm
Volume: 1.770 cum