
ASSIGNMENT
Project Concept
Preliminary Project
Final Project
Executive Project

PLACE
Valbrembo – Bergamo
Description
The project is inspired by the need of the Evoca Spa company, to renew a part of its production site in Valbrembo with the aim of creating new spaces for product testing laboratory.
The project includes:
- demolition of the waste shed,
- partial demolition of the adjoining offices,
- construction of new building: West Laboratory (3 floors above ground),
- construction of a new canopy for the ecological area,
- general reorganization of the external forecourts.

Period: 2019
Characteristics of the intervention:
Project area: 46.500 sqm
Covered area: 850 sqm
Gross floor area: 2.000 sqm
Volume: 10.500 cum
Amount of works:
2.000.000,00 Euro