
Civil executive project
Design and Construction Supervision of structures
Safety, planning and execution coordinator

Stezzano – Bergamo
Description
The building, located in the Technological Pole, is organized on four ground floors and one underground and it consists of two volumes whose internal facades overlook a central atrium lit by a large skylight.
The building allows the connection between the parking along the highway and the place of access to the Park; by location, structure and hosted services, this building became the entrance of the whole Park.
The building houses the following functions: parking are located in the underground; the refreshment point, the reception/lobby area, meeting rooms, classrooms are located on the ground floor; the services (computer, press centre…), bank, post office, newsagent/bookstore are located on the first floor (entrance level from the red wall); the offices are on the second and third floor.
The vegetation is reflected on the facades, creating a continues and dilated perceptual effect of the Park.

Period: 2005-2008
Charateristics of the intervention:
Project area: 3.962 sqm
Covered area: 2.600 sqm
Gross floor area: 9.500 sqm
Volume: 52.000 cum
Amount of works:
12.555.900 Euro