Final design for authorizations
Executive project for Offer Requests
Construction management, Procurement assistance
Safety in the Design phase
Works Management
Safety during Execution, Works Manager
Bergamo
Description
The project consists in adapting the existing structure, especially the second floor of the building, according to qualified needs in terms of services, systems and functions and according to the various specific regulations.
The new internal distribution of the spaces makes it possible to create 11 rooms with two beds and 9 rooms with one bed, for a total of 31 beds, each equipped with a toilet in compliance with the overcoming of architectural barriers.
Each room will be equipped with an independent bathroom, bed head beams with medical gases.
Period: 2017
Characteristics of the intervention:
Project area: 15.653,11 sqm
Covered area: 848,34 sqm
Gross floor area: 848,34 sqm
Volume: 2.867,39 cum