Assignment
Structure Design
Construction Supervision
Place
Torbole Casaglia – Brescia
Description
Construction of a new foundry line inside the old buildings; realization of existing slab reinforcements with doubling and plating beams for new lines. Concrete decks and metal structures for plant support; bases for furnace.
Period: 1995
Characteristics of intervention:
Number of floors: 4
Project area: 108 sqm
Volume: 1990 cum