Executive Project and General Construction Supervision
Design and Construction Supervision of Structures
Design and of Electrical and Mechanical systems
Safety requirements
Treviglio – Bergamo
Description
The new plant consists of 6 interconnected buildings, each designed to optimize the production process and allow the indoor flow of staff, with the most suitable structure to meet the needs of space and firefighting. The materials used are: concrete in place for the stairwells, the office building and the central technological building; prefabricated structures for paper warehouse, semi-finished product warehouse and printing building; steel structures for the covering of the packaging department and shipping warehouse in which free spans of 40 meters have been made.
Period: 2001 – 2005
Characteristics of the intervention:
Project area: 149.837sqm
Covered area: 44.311sqm
Gross floor area: 55.439sqm
Volume: 505.528cum
Amount of works:
21.170.000 euro